
Ongoing Work
-
Sparklight Idaho/Arizona
-
Fiber Optic Splicing
-
Setting up new splice cases
-
OTDR testing
-
Auditing of Existing Fiber
-
Fiber Optic Design
-
FTTH
-
EPON Business Networks
-
2020
-
($150,000) Idaho Falls Power Fiber Optic Infrastructure Upgrade
-
Fiber Optic Splicing
-
Setting up new splice cases
-
OTDR testing
-
Auditing of Existing Fiber
-
2021
-
($80,000) Ziply Fiber Install
-
Fiber Optic Splicing
-
Setting up new splice cases
-
OTDR testing
-
2023
-
E4 Connect (Nevada, Idaho, Oregon)
-
Fiber Optic Splicing
-
Setting up new splice cases
-
OTDR testing
-
Fiber Optic Design
-
FTTH
-
-
Albion Telephone
-
Fiber Optic Splicing
-
Setting up new splice cases
-
OTDR testing
-
FTTH
-
Outside Plant Projects
Building Cabling
Ongoing Work
-
College of Western Idaho
-
Installed 200,000′ of cable in multiple buildings
-
Tested, terminated, and certified cabling
-
Fiber optic placement & splicing
-
2022
-
USLI
-
Installed 50,000′ CAT6 Cabling
-
Terminating, Testing, & Certifying
-
Manufacturer Warranty Ortronics
-
2023
-
Linage Cold Storage
-
Installing Wireless Access Points
-
Point to Point Building Bridges
-
Certified & Tested System
-
-
Treasure Valley Community College
-
Installed New 288 strand fiber ring around campus
-
CAT6 Cabling in multiple buildings
-
All systems were tested, terminated, and certified
-
Government Work
Ongoing Work
-
Gowen Field
-
Installed new 288 strand fiber on block 500
-
Tested, terminated, & certified cabling
-
300,000′ of CAT6 cable in multiple buildings
-
2020
-
Mates Tank Range
-
Installed a 48 strand fiber between all targets
-
Terminated, tested, and certified all cabling
-
2020
-
Mountain Home Airforce Base
-
Repaired 432 strand fiber that was damaged
-
Installed fiber optic cabling between multiple buildings
-
-
Green River County Jail
-
250,000′ CAT6 Cable Installed
-
System was certified, tested, and terminated
-





.png)